We are property development managers with innovative fast  construction-method guidelines and a vision to help you

Executive Summary

This blended construction on two work-fronts gives us an advantage for speed of construction.  Improved speed of construction and efficiency with less wet weather delays means more completed projects in a given period. This then means re-invested funds work harder.

Major flooding over a long period in many areas of NSW is causing massive damage to homes and contents. The cleanup is having a huge impact on landfill, waterways, oceans & environments. Current housing stock has not been designed for these new flood-events.

Modular Townhouses Pty Limited has a plan for more efficient and fast construction of stylish architecturally designed medium density housing of almost unlimited traditional modern style that can be modified for land that is occasionally flooded. We have a plan that can include staged construction for early temporary accommodation for residents. 

Factory Built Modular Townhouse
Our Solution

Does not restrict capacity by relying on one factory. We have made connections and will continue to make new connections with multiple modular building fabricators and principal contractors to ensure capacity is not limited. This way, we are constantly searching for best price, quality and efficient timely delivery for our customers.

Reduces impact on landfill caused by cleanups & demolition as well as reducing urban sprawl, saving arable and natural ground. Reduces toxic pollution of waterways, farmlands and ocean which supports a huge food source as well as Reducing travel time for trades people with proposed improvement to lifestyle. Reduces traffic on roads and freeways caused by trades people travelling long distances every day with the associated carbon footprint

Characteristic Structural Guidelines Include:

A key component being the transportable floor framing which usually has an overall structural thickness 150mm.

This floor framing that is galvanised steel with no hollow steel sections as primary supports.

Dwellings that can be mounted on a suspended slab set above peak predicted flood level, or on non-flooding ground with footings and a non-structural concrete slab or blinding layer with wpm

Lifting details to allow for placement of side by side dwellings (sardine style placement)

Provisions for crane lifting and re-lifting

That the concrete slabs under dwelling will be screeded with falls to a central drain to avoid ponding in the event of a water leak. This could be a good monitor for plumbing maintenance issues.